Daily Archives: August 27, 2010


Pouring the baptistry


Panorama from Southeast corner of the parking lot. Bioswails are being prepared, lighting in place, StVdP Modular and the church is seen through the trees.

Pouring the cement for the Baptistry.

Inside the church

Prepping the baptistry for its pour with metal framing on top to hold floor grates.

View of newly poured floor from the Presider’s area.
Panorama view from Choir side.

Panorama view from Presider’s side.

Panorama view from Entrance.